Quality

Quality is a document trail, not a slogan

For a part that will be buried inside a machine for a decade, the paperwork matters as much as the steel. Every batch ships with a material certificate, hardening record, dimensional report and torque test, so a claim can be traced to a heat number.

What travels with every shipment

Material

  • Mill certificate with heat number
  • Chemical composition and mechanical properties
  • Traceable to the finished ring

Heat treatment

  • Raceway hardness readings
  • Hardened depth measurement
  • Soft zone location marked
  • Gear tooth hardness where applicable

Geometry & running

  • Dimensional inspection report
  • Axial and radial clearance record
  • Running torque measurement
  • Gear backlash check

Inspection stages

StageCheckRecord
Incoming materialComposition vs certificateHeat number logged
TurningRaceway and mounting face dimensionsIn-process gauge log
Heat treatmentHardness and hardened depthHardness curve per batch
GrindingRaceway profile, runoutCMM / profile report
AssemblyClearance, torque, backlashFunctional test sheet
PackingSeal, plugs, rust preventionPhoto record with the packing list

Third-party inspection

For projects that need an independent witness, we arrange inspection through SGS, BV or TUV at the factory before packing, and the report ships with the documents. The cost is quoted separately so you can decide per project.

  • Pre-shipment inspection on request
  • Witnessed load test for assemblies
  • Certificates legalised for customs where required

Ask for a sample inspection report

We will send a redacted report for a similar part so you can see exactly what arrives with your shipment.